Location of performance / Site: | Bir El Ater, Tebessa, Algeria, Africa |
---|---|
Period: | May 2004 - Aug 2007 |
• Initial Study
• Preliminary Design,
• Construction Design and assistance with contract awarding for treatment and disposal facilities for hazardous waste.